Skip to main content
Wake County, NC Home

Riparian Buffers

Turnipseed Park

Riparian buffers are undisturbed, protected areas along streams and ponds that are required by state regulations and local ordinances. Buffer ordinances require vegetated strips along streams and water bodies that slow stormwater runoff, filter pollutants and help protect water quality. Riparian buffers are divided into two zones. In the zone closest to the streambank, vegetation should remain undisturbed, while the outer zone can have managed vegetation.

Wake County's riparian buffer ordinance applies to unincorporated areas of the county and is set forth in Article 11-10 of the Unified Development Ordinance (UDO). The ordinance requires development to follow the NC Department of Environmental Quality (NC DEQ) riparian buffer protection rule, 15A NCAC 02B .0714 Neuse River Basin Buffer Rule (Eff. 8/1/00, Amended Eff. 6/15/20). This requirement applies to projects in unincorporated Wake County within either the Neuse River or Cape Fear River basins.

Allowable uses within riparian buffers are detailed in 15A NCAC 02B .0714.

If you are unsure whether a riparian buffer exists on your project site, you may request an official riparian buffer rule applicability determination for surface water features. The determination is valid for five years. After that period, another riparian buffer determination will be required.

Riparian Buffer Determination Contacts by River Basin
River BasinAgency Responsible for DeterminationContact
Neuse RiverNC DEQ Raleigh Regional Office919-791-4200
Cape Fear

Wake County Watershed Management

Buffer Determination Request Form

919-856-7436

 

For more information about code enforcement for riparian buffers, contact Wake County Watershed Management at 919-856-7436.

Frequently Asked Questions

Can I clear the riparian buffer area during construction?

No. Soil-disturbing site preparation activities are not allowed in Zone 1.

For clearing and regrading in Zone 2, please contact Wake County Watershed Management to discuss whether there is no alternative site preparation.

Can I put a fence in the riparian buffer area?

Per 15A NCAC 02B .0233(6), fences may be installed if disturbance is minimized and installation does not result in the removal of forest vegetation. Measure 50 feet from the top of the streambank to determine whether the fence falls within the riparian buffer.

Make sure to install a fence that allows water to pass through it. Some privacy fences can block the downhill flow of water and cause drainage problems.

What landscaping can I do in the riparian buffer?

  • Periodic mowing and harvesting of plant products may occur in Zone 2 only.
  • Planting vegetation to enhance the riparian buffer is encouraged.
  • Pruning forest vegetation is allowed, provided that the health and function of the vegetation are not compromised.
  • Nuisance vegetation, such as poison ivy and non-native invasive plants, may be removed.
  • Individual trees may be treated to maintain or improve their health, form or vigor.
  • Harvesting dead or infected trees or applying pesticides necessary to prevent or control extensive tree pest and disease infestations is allowed. These practices must be approved by the Division of Forest Resources for a specific site. The Division of Forest Resources must notify the Division of all approvals.
  • Individual trees that pose a danger to structures or human life may be removed.
  • Natural regeneration of forest vegetation and planting trees, shrubs or ground cover plants to enhance the riparian buffer are allowed, provided that soil disturbance is minimized. Plantings must consist primarily of native species. Refer to the Guidelines for Riparian Buffer Restoration (PDF).
  • Emergency fire control measures may be allowed, provided that topography is restored. High-intensity prescribed burns are not allowed.
  • Fertilizer application is not allowed except as necessary for permanent stabilization. Broadcast application of fertilizer or herbicides to the adjacent forest stand must be conducted so that the chemicals are not applied directly to or allowed to drift into the riparian buffer.