Watershed Management Fees
Fees by project type
Commercial Properties and Subdivisions
Erosion Control & Sedimentation
| Type |
When is the fee due? |
Cost |
| Commercial & subdivisions outside unincorporated Wake County – plan review fee |
Upon application submission; must be renewed two years after issue date |
$250 per acre |
| Unincorporated Wake County – subdivision plan review |
Upon application submission; must be renewed two years after issue date |
$275 |
| Land disturbance permit |
Prior to preconstruction meeting |
$250 per acre |
| Plan resubmission fee |
Due at the second and subsequent resubmissions |
$250 |
| 2-year plan renewal fee |
When requested for an expired permit |
$250 per acre |
| 1-year plan renewal fee |
When requested for an expired permit |
$125 per acre |
| Re-inspection – certificate of compliance or completion |
Due at the second and subsequent inspections |
$250 |
| Re-inspection – enforcement |
Due at the second and subsequent inspections |
$250 |
Stormwater
| Type |
When is the fee due? |
Cost |
| Stormwater plan review |
Upon application submission |
$250 per acre |
| Stormwater permit |
Prior to preconstruction meeting |
$250 per acre |
| Added acreage to stormwater permit |
Upon application resubmission |
$250 per acre |
| Plan resubmission fee |
At the second and subsequent resubmissions |
$250 |
| As-built re-inspection |
At the second and subsequent inspections for as-built inspections |
$250 |
| Re-inspection for enforcement |
At the second and subsequent inspections for enforcement |
$250 |
Single Family Lots
Erosion Control & Sedimentation
State statute allows the applicant to make lot-by-lot submissions at the flat rate or $100 per lot, whichever is lower
| Type |
When is the fee due? |
Cost |
| Lot-by-lot plan review fee |
Upon application submission |
Lesser of $100 per lot or $250 per acre |
| Lot-by-lot plan resubmission fee |
At the second and subsequent resubmissions |
Lesser of $100 per lot or $250 flat |
| Re-inspection – certificate of compliance or completion |
At the second and subsequent inspections |
$250 |
| Re-inspection – enforcement |
At the second and subsequent inspections |
$250 |
Stormwater
| Type |
When is the fee due? |
Cost |
| Stormwater certification review |
Through the building permitting process |
$50 |
| Stormwater deviation (review and permit fee) |
Upon application submission |
$400 |
| Stormwater deviation plan resubmission fee |
At the second and subsequent resubmissions for additional changes to the deviation |
$250 |
| As-built re-inspection |
At the second and subsequent inspections for as-built inspections |
$250 |
| Re-inspection – enforcement |
At the second and subsequent inspections |
$250 |
Floodplain Management
| Type |
When is the fee due? |
Cost |
| Major flood study |
For plans with development in Special Flood Hazard Areas and drainage area ≥ 100 acres |
$1,000 per crossing |
| Minor flood study |
For plans with development in Special Flood Hazard Areas and drainage area < 100 acres |
$500 per crossing |
| Floodplain encroachment review (non-residential only) |
Upon application completion |
$50 |
| Flood certification review (residential only) |
Upon application completion |
$50 |