Residential Onsite Wastewater (Septic Only)
Permit Type |
Fee |
New Development Individual On-Site Wastewater |
|
|
$400 |
|
$400 |
(Includes requested revisions to existing construction authorizations) |
Total $800 |
Manufactured/Mobile Home Relocation (Construction Authorization Only) |
$400 |
Mobile Home Relocation Fee Inside Permitted Mobile Home Parks |
No Fee |
Manufactured/Mobile Home Relocation-Modifications needed/change in design flow |
|
|
$400 |
|
$400 |
Total $800 |
|
Verifications for Change of Use or System Reuse (Existing Onsite Wastewater systems only. No change to flow or lot size) |
$400 |
Renew Septic Permit (expired after 5 years) |
|
|
$400 |
|
$800 |
Design Review Fee for Residential Permits |
$110 |
Re-Inspection Fee (Penalty for unnecessary return trips on Lot Evaluations and Failed Installation Inspections) |
$200 |
Field Consultation |
$100 |
Commercial Wastewater Permits (Designed/Engineered/Large Systems)
Permit Type |
Fee |
Domestic Strength Wastewater Systems (≤ 720 gallons/day design flow) (Excluding Industrial Process Wastewater) |
|
|
$400 |
|
$400 |
|
$110 |
|
Total $910 |
Domestic Strength Wastewater Systems (>720 and ≤ 3,000 gallons/day design flow) Industrial Process Wastewater (≤ 3,000gallons/day design flow) |
|
|
$400 |
|
$400 |
|
$460 |
Total $1260 | |
Domestic Strength Wastewater Systems (> 3,000 gallons/day design flow) Industrial Process Wastewater (> 3,000gallons/day design flow) Connection is equivalent to 360 gallons/day design wastewater flow |
Per Connection |
|
$400 |
|
$400 |
|
$110 |
LPP or Alternative Systems (O & M Inspections) (Type V and Type VI Systems – per connection) Connection =360 gallons per day design wastewater flow |
$19/conn. |